Dam Monitoring and Management

"The English version is provided via machine translation from the original Greek text. We apologise for any inconsistencies"

MONITORING AND MANAGEMENT OF FACILITIES DURING THE OPERATION OF THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

MONITORING AND MANAGEMENT OF FACILITIES DURING THE OPERATION OF THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

Project budget: 234.481,00 €
Subject

Monitoring and management of the facilities of the active dams of Kozani Regional Unit.

Description
The dams of Sisani, Milochori, Mesovouno, and Pramoritsa have already been completed, and the corresponding reservoirs have been filled. These infrastructures fall under the jurisdiction of the Regional Unit of Kozani, with the Directorate of Technical Works of Kozani acting as the implementing authority.
The dams are currently operating according to their intended purposes:
The first three (Sisani, Milochori, Mesovouno) serve irrigation needs for the agricultural lands of the respective settlements.
The Pramoritsa Dam is used for drinking water supply to the settlements of the Voio region, as well as for electricity generation.
Under the current contract, the following activities are foreseen:
Recording of reservoir water levels
Visual inspections and checks, including:
Dam and abutment inspections
Diversion and intake pipeline inspections
Geodetic measurements
Monitoring of geotechnical instrumentation
Result

Creation of a historical archive of dam behaviour and preventive measures for unusual events.

PREPARATION OF THE APPROVAL REQUEST FILE FOR THE DAMS OF KOZANI PREFECTURE BY THE DAM ADMINISTRATIVE AUTHORITY (PHASE A) / KOZANI REGIONAL UNIT

PREPARATION OF THE APPROVAL REQUEST FILE FOR THE DAMS OF KOZANI PREFECTURE BY THE DAM ADMINISTRATIVE AUTHORITY (PHASE A) / KOZANI REGIONAL UNIT

Project budget: 233.153,00 €
Subject

Preparation of files for the submission of approval requests for the dams of Kozani Regional Unit to the Dam Administrative Authority.

Description
The following actions are foreseen under the contract for each dam:
Updated Dam Register, in accordance with Article 15 of the Dam Safety Regulation (DSR)
Monitoring Plan, in accordance with Article 8 of the DSR
Draft Operation and Maintenance Manual
Preparation of the study dossier and cost estimation for the development of the Emergency Action Plan (EAP), in accordance with Article 10 of the DSR
Land ownership and area data
Verification of the validity period of the approved Environmental Terms (AEPO) and completion of the necessary procedures for their extension, if required
Sample-based dam monitoring
Result

Approval of dam operations in Kozani Regional Unit by the Dam Administrative Authority.

TECHNICAL STUDIES FOR THE EMERGENCY ACTION PLANS (EAP) OF THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE EMERGENCY ACTION PLANS (EAP) OF THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

Project budget: 203.556,00 €
Subject

Preparation of technical studies and emergency response plans (S.A.E.K.) for the dams of Kozani Regional Unit.

Description
To ensure the safe operation of each of the Sisani, Milochori, Mesovouno, and Pramoritsa dams, safety systems have been installed. These include frequent inspections, monitoring, and instrumented recording of dam behaviour.
Within the framework of the contract, the following studies were carried out for each dam:
Dam breach analysis
Flood wave routing study
Emergency Action Plan (EAP) study
Result

Ensuring uninterrupted and safe operation of dams in Kozani Regional Unit.

DAM OPERATION ENTITY (DOE) FOR THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

DAM OPERATION ENTITY (DOE) FOR THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA / KOZANI REGIONAL UNIT

Project budget: 430.996,00 €
Subject

Operation of ANKO as the Operating Body of the four dams (F.L.F.) of Kozani Regional Unit.

Description
The actions undertaken by AN.KO as the Dam Safety Monitoring Entity (DSME) for the Sisani, Milochori, Mesovouno, and Pramoritsa dams during the years 2021, 2022, and 2023 included:
Monitoring of dam operation – collection, recording, classification, and evaluation of instrument readings
Updating of the Dam Register
Submission of reports to the Dam Management Authority (DMA)
Updating of the Emergency Action Plans (EAPs)
Activation of EAP procedures, when required
Coordination of dam maintenance works and protection of adjacent properties
Ensuring compliance with approved Environmental Terms (AEPO) and renewal of their validity period, where necessary
Collaboration with Civil Protection authorities for public education and training on dam safety-related incidents and emergency response
Result

Ensuring uninterrupted and safe operation of dams in Kozani Regional Unit.

TECHNICAL STUDY FOR THE CONSTRUCTION OF A DAM AT THE LOCATION 'AMAR BEI' IN THE COMMUNITY OF LIVADERO OF THE MUNICIPALITY OF SERVIA (PHASE A) / KOZANI REGIONAL UNIT

TECHNICAL STUDY FOR THE CONSTRUCTION OF A DAM AT THE LOCATION 'AMAR BEI' IN THE COMMUNITY OF LIVADERO OF THE MUNICIPALITY OF SERVIA (PHASE A) / KOZANI REGIONAL UNIT

Project budget: 203.556,00 €
Subject

Preparation of technical studies for the construction of a dam in the municipal unit of Livadero in Servia Municipality.

Description
The construction of the Livadero Dam, located in the Amar Bey area on the Vrykolakia stream near the settlement of Livadero, aims to store water for irrigation purposes in the Livadia area of the Livadero agricultural zone.
As part of the project, the following are also foreseen:
Improvement of the access road to ensure safe approach to the dam site,
Construction and inspection of the dam and its associated infrastructure.
The project aims to irrigate the lowland area northeast of the settlement, which includes approximately 3,000 stremmas of arable land.
The studies foreseen under the current contract include:
Supervision and evaluation of Phase A geotechnical investigations
Phase A geotechnical investigations
Preliminary geological study
Forest road study
Preliminary road alignment study
Techno-economic feasibility study
Preliminary agro-technical study
Preliminary hydrological study
Health & Safety Plan and File (HSP/FSP)
Result

Improvement of irrigation conditions and coverage of irrigation needs in Livadero farmland.

INSTALLATION OF HYDROELECTRIC UNITS ON THE INTERCONNECTION PIPELINE OF THE SISANIO DAM OF THE MUNICIPALITY OF VOIO WITH THE EXISTING IRRIGATION NETWORK - TECHNICAL STUDIES AND LICENSING / KOZANI REGIONAL UNIT

INSTALLATION OF HYDROELECTRIC UNITS ON THE INTERCONNECTION PIPELINE OF THE SISANIO DAM OF THE MUNICIPALITY OF VOIO WITH THE EXISTING IRRIGATION NETWORK - TECHNICAL STUDIES AND LICENSING / KOZANI REGIONAL UNIT

Project budget: 490.000,00 €
Subject

Execution of all necessary actions for the installation of electromechanical equipment of the turbine generator in the designated area of the Sisani dam construction project and legalisation of its operation.

Description
A dam has already been constructed by the Regional Unit of Kozani with the purpose of creating a reservoir for water storage and management, serving both irrigation needs for the cultivated areas of the region and electricity generation. The dam is located on the Myrichos River, a tributary of the Aliakmonas River.
The useful storage capacity of the reservoir is approximately 760,000 m³, with an average water level of around 810 metres.
To irrigate the agricultural land and replace existing boreholes, water pumping is required.
Electricity will be generated by exploiting the 25-metre head created by the dam.
The hydroturbine capacity is estimated at approximately 330 kW.
The generated electricity will fully cover the annual energy needs of the irrigation pumping stations.
Studies Foreseen Under the Current Contract
Study for the establishment of the operating entity
Hydrological study
Feasibility and sustainability study
Dossier for the issuance of a power generation licence from the Regulatory Authority for Energy (RAE)
Dossier for the offer and terms of connection contract from HEDNO (Hellenic Electricity Distribution Network Operator)
Dossier for the issuance of a water use and works execution permit
Dossier for the installation permit of the Small Hydropower Plant (SHP)
Update of the hydropower station study and preparation of tender documents for the electromechanical equipment
Dossier for the issuance of the operation licence
Result

Support for agricultural production, crop restructuring, and income improvement for farmers.

INSTALLATION OF HYDROELECTRIC UNITS ON THE INTERCONNECTION PIPELINE OF THE MESOVOUNO DAM OF THE MUNICIPALITY OF EORDAIA WITH THE EXISTING IRRIGATION NETWORK - TECHNICAL STUDIES AND LICENSING / KOZANI REGIONAL UNIT

INSTALLATION OF HYDROELECTRIC UNITS ON THE INTERCONNECTION PIPELINE OF THE MESOVOUNO DAM OF THE MUNICIPALITY OF EORDAIA WITH THE EXISTING IRRIGATION NETWORK - TECHNICAL STUDIES AND LICENSING / KOZANI REGIONAL UNIT

Project budget: 1.800.000,00 €
Subject

Execution of all necessary actions for the installation of hydroelectric units on the interconnection pipeline of the Mesovouno dam with the existing irrigation network.

Description
The Regional Unit of Kozani is in the final stage of constructing a new multifunctional pipeline with a nominal diameter of DN300 and a total length of approximately 6,300 metres. The pipeline starts from the existing Mesovouno reservoir and ends at the irrigation tank of the Mesovouno irrigation system. It is made of steel, with variable wall thickness depending on the maximum operating pressure along each section of the route.
According to the pipeline design, two small hydropower units (SHP1 & SHP2) will be installed to generate electricity by utilising the available hydraulic head.
Studies Foreseen Under the Current Contract
Study for the establishment of the operating entity
Dossier for the issuance of a power generation licence from the Regulatory Authority for Energy (RAE)
Preliminary Environmental Impact Assessment (PEIA) for the SHPs
Dossier for the offer and terms of connection contract from HEDNO for both SHPs
Environmental Impact Assessment (EIA) for both SHPs
Land securing procedures and topographic surveys for SHP1 and SHP2 sites
Dossiers for the issuance of water use and works execution permits for both SHPs
Dossiers for the issuance of installation permits for both SHPs
Engineering geological study for the SHP1 and SHP2 sites
Final architectural and structural design studies for SHP1 and SHP2 buildings, including Health & Safety Plans (HSP/FSP), tender documents, and building permit issuance
Preliminary design and tender documents for the procurement and installation of electromechanical equipment for SHP1 and SHP2
Dossiers for the issuance of operation licences for SHP1 and SHP2
Result
Improvement of the existing irrigation network and more efficient water management with environmental benefits.
DAM OPERATION ENTITY (DOE) FOR THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA OF KOZANI PREFECTURE (2023)

DAM OPERATION ENTITY (DOE) FOR THE DAMS OF SISANIO, MILOCHORI, MESOVOUNO AND PRAMORITSA OF KOZANI PREFECTURE (2023)

Project budget:
Subject

The subject of this project is the fulfilment by ANKO of the duties of the Operating Body of the Sisani, Milochori, Mesovouno and Pramoritsa dams of Kozani Regional Unit from 01.01.2023 to 31.12.2023, in accordance with article 6 of the aforementioned Dam Operation Regulation.

Description
Result