Preparation of technical studies for the procurement and installation of a biomass district heating system for public buildings in the settlement of Lemos, Prespes Municipality.
Energy saving and reduction of heating costs in public buildings.
Preparation of technical studies for the installation of an interconnection pipeline between Kozani’s district heating system and the unified district heating network of Western Macedonia.
According to the decarbonisation plan for Western Macedonia, the lignite-fired units supplying thermal energy to the Kozani district heating system at the Agios Dimitrios Power Plant (PP) are scheduled for decommissioning by December 2023 (Units III and IV by December 2022, Unit V by December 2023). Similarly, the Amynteo PP (Units I and II) was decommissioned in August 2020, and the Kardia PP (Units III and IV) in April 2021.
To adapt the district heating systems of Western Macedonia to the new energy landscape, the relevant stakeholders signed a Memorandum of Understanding and Strategic Cooperation (MoU). The aim is to ensure continuous thermal energy supply during the transition period and beyond, in line with the National Energy and Climate Plan (NECP).
The MoU defines:
The geographical locations of new thermal energy production units for district heating
The roles and responsibilities of the involved parties to achieve this objective
Scope of the Interconnection Project
Interconnection facilities within the premises of the Kardia Power Plant
Interconnection facilities within the premises of DEYAK (Municipal Water and Sewerage Company of Kozani) in Kasla
Thermal energy transmission pipeline
Studies Foreseen Under the Current Contract
Technical studies (buildings and electromechanical works for pumping stations, transmission networks, tender documents, and Health & Safety Plans – HSP/FSP)
Environmental Impact Assessment (EIA)
Thermal energy distribution licence
Topographic and cadastral survey
Geological study
Geotechnical study for the pumping station
Interconnection of Kozani district heating with the unified district heating network of Western Macedonia.
Elaboration of technical studies for the interconnection of the district heating system of Amyntaio with the unified district heating network of Western Macedonia.
Interconnection of Amyntaio district heating with the unified district heating network of Western Macedonia.
Support to DETEPA in formulating its strategy on long-term operation and expansion of the district heating system of the Amyntaio area.
Ensuring the operation and viability of the district heating system in the wider area of Amyntaio.
Increase of thermal capacity of the district heating system of Ptolemaida.
Ensuring the operation and viability of the district heating system of Ptolemaida.