District Heating Systems

"The English version is provided via machine translation from the original Greek text. We apologise for any inconsistencies"

TECHNICAL STUDY FOR THE SUPPLY AND INSTALLATION OF A DISTRICT HEATING SYSTEM FOR PUBLIC INTEREST BUILDINGS WITH CENTRAL BIOMASS FEEDING IN THE SETTLEMENT OF LAIMOS OF THE MUNICIPALITY OF PRESPES / FLORINA REGIONAL UNIT

TECHNICAL STUDY FOR THE SUPPLY AND INSTALLATION OF A DISTRICT HEATING SYSTEM FOR PUBLIC INTEREST BUILDINGS WITH CENTRAL BIOMASS FEEDING IN THE SETTLEMENT OF LAIMOS OF THE MUNICIPALITY OF PRESPES / FLORINA REGIONAL UNIT

Project budget: 30.000,00 €
Subject

Preparation of technical studies for the procurement and installation of a biomass district heating system for public buildings in the settlement of Lemos, Prespes Municipality.

Description
The Municipality of Prespes aims to minimise heating costs for public-interest buildings in the settlement of Lemos, by utilising locally available biomass. To this end, the municipality is promoting the documentation and planning of a district heating system for selected public buildings in Lemos, based on:
Centralised biomass combustion in suitable boilers
Distribution of hot water through pre-insulated pipelines
Studies Foreseen Under the Current Contract
Feasibility and sustainability study
Preparation of a technical dossier and installation specifications for the district heating system
Preparation of tender documents for the procurement and installation of the district heating system
Result

Energy saving and reduction of heating costs in public buildings.

TECHNICAL STUDY FOR THE INTERCONNECTION PIPELINE OF THE KOZANI DISTRICT HEATING SYSTEM WITH THE UNIFIED DISTRICT HEATING NETWORK OF WESTERN MACEDONIA / KOZANI & FLORINA REGIONAL UNITS

TECHNICAL STUDY FOR THE INTERCONNECTION PIPELINE OF THE KOZANI DISTRICT HEATING SYSTEM WITH THE UNIFIED DISTRICT HEATING NETWORK OF WESTERN MACEDONIA / KOZANI & FLORINA REGIONAL UNITS

Project budget: 43.400.000,00 €
Subject

Preparation of technical studies for the installation of an interconnection pipeline between Kozani’s district heating system and the unified district heating network of Western Macedonia.

Description

According to the decarbonisation plan for Western Macedonia, the lignite-fired units supplying thermal energy to the Kozani district heating system at the Agios Dimitrios Power Plant (PP) are scheduled for decommissioning by December 2023 (Units III and IV by December 2022, Unit V by December 2023). Similarly, the Amynteo PP (Units I and II) was decommissioned in August 2020, and the Kardia PP (Units III and IV) in April 2021.
To adapt the district heating systems of Western Macedonia to the new energy landscape, the relevant stakeholders signed a Memorandum of Understanding and Strategic Cooperation (MoU). The aim is to ensure continuous thermal energy supply during the transition period and beyond, in line with the National Energy and Climate Plan (NECP).
The MoU defines:
The geographical locations of new thermal energy production units for district heating
The roles and responsibilities of the involved parties to achieve this objective

Scope of the Interconnection Project
Interconnection facilities within the premises of the Kardia Power Plant
Interconnection facilities within the premises of DEYAK (Municipal Water and Sewerage Company of Kozani) in Kasla
Thermal energy transmission pipeline

Studies Foreseen Under the Current Contract
Technical studies (buildings and electromechanical works for pumping stations, transmission networks, tender documents, and Health & Safety Plans – HSP/FSP)
Environmental Impact Assessment (EIA)
Thermal energy distribution licence
Topographic and cadastral survey
Geological study
Geotechnical study for the pumping station

Result

Interconnection of Kozani district heating with the unified district heating network of Western Macedonia.

COMPLETION OF PROJECT MATURATION FOR THE INTERCONNECTION OF THE DISTRICT HEATING SYSTEM OF AMYNTAIO OF FLORINA PREFECTURE WITH THE UNIFIED DISTRICT HEATING NETWORK OF WESTERN MACEDONIA & SUPPORT TO DETEPA FOR THE TENDERING & SUPERVISION OF THE PROJECT / FLORINA REGIONAL UNIT

COMPLETION OF PROJECT MATURATION FOR THE INTERCONNECTION OF THE DISTRICT HEATING SYSTEM OF AMYNTAIO OF FLORINA PREFECTURE WITH THE UNIFIED DISTRICT HEATING NETWORK OF WESTERN MACEDONIA & SUPPORT TO DETEPA FOR THE TENDERING & SUPERVISION OF THE PROJECT / FLORINA REGIONAL UNIT

Project budget: 26.800.000,00 €
Subject

Elaboration of technical studies for the interconnection of the district heating system of Amyntaio with the unified district heating network of Western Macedonia.

Description
DETEPA is planning the construction of a thermal energy transmission system using hot water circulation, to interconnect the district heating networks of Amyntaio and Ptolemaida. The project, with a nominal thermal transmission capacity of 25 MWth, includes:
A 14.5 km pipeline network
Interconnection facilities at both district heating installations
The project is funded by the Managing Authority of the Operational Programme Transport Infrastructure, Environment and Sustainable Development (EY/EP YMEPERAA) through a public tender procedure under Article 50 of Law 4412/2016, following official correspondence (Ref. No. 1655/17.02.2022) addressed to DETepa.
Studies and Support Services Provided by ANKO under the Current Contract
Cadastral study
Support in establishing pipeline easements
Preparation of tender documents in accordance with Article 50 of Law 4412/2016
Support during the tendering process and project supervision
Result

Interconnection of Amyntaio district heating with the unified district heating network of Western Macedonia.

TECHNICAL STUDIES FOR THE LONG-TERM OPERATION AND EXPANSION OF THE DISTRICT HEATING SYSTEM OF THE AMYNTAIO AREA OF FLORINA PREFECTURE / FLORINA REGIONAL UNIT

TECHNICAL STUDIES FOR THE LONG-TERM OPERATION AND EXPANSION OF THE DISTRICT HEATING SYSTEM OF THE AMYNTAIO AREA OF FLORINA PREFECTURE / FLORINA REGIONAL UNIT

Project budget: 204.239,00 €
Subject

Support to DETEPA in formulating its strategy on long-term operation and expansion of the district heating system of the Amyntaio area.

Description
DETEPA aims to promptly define its strategic direction in light of developments in the energy sector and the integration of district heating systems in Western Macedonia into a unified network. To this end, DETEPA is collaborating with ANKO.
Support Services Provided by ANKO under the Current Contract
Investigation of long-term heat supply solutions for the wider Amyntaio area
Support services for the implementation of the biomass heating system project
Assessment of the potential expansion of the existing Amyntaio district heating system to additional settlements within the municipality
Development of an autonomous district heating system in a selected settlement of the Municipality of Amyntaio
Result

Ensuring the operation and viability of the district heating system in the wider area of Amyntaio.

INCREASE OF THE THERMAL CAPACITY OF THE DISTRICT HEATING SYSTEM OF PTOLEMAIDA / KOZANI REGIONAL UNIT

INCREASE OF THE THERMAL CAPACITY OF THE DISTRICT HEATING SYSTEM OF PTOLEMAIDA / KOZANI REGIONAL UNIT

Project budget: 606.239,00 €
Subject

Increase of thermal capacity of the district heating system of Ptolemaida.

Description
The Municipality of Eordaia is addressing a critical issue concerning the Ptolemaida district heating system, with the following key objectives:
Assessment of alternative scenarios to meet immediate and medium-term needs
Interconnection with the new Ptolemaida V Power Plant, currently under construction
Immediate reinforcement of backup capacity, to prevent future underperformance of the district heating system
For methodological clarity and effective planning, the project is divided into three (3) distinct Subprojects:
Subproject 1: Evaluation of Alternative Scenarios for Immediate and Medium-Term Needs
Assessment of base load and reserve capacity requirements for the Ptolemaida district heating system
Identification and definition of alternative solutions
Investigation of long-term base load and reserve supply options
Formulation of final proposals and supporting actions
Subproject 2: Interconnection with the New Ptolemaida V Power Plant
Preliminary design of the thermal energy transmission system
Topographic and cadastral survey
Environmental Impact Assessment (EIA) and environmental permitting
Thermal energy distribution licence
Final design of the thermal energy transmission system
Tender documents for the transmission system
Geological study
Engineering geological study for the pumping station
Geotechnical study for the pumping station
Financial analysis
Result

Ensuring the operation and viability of the district heating system of Ptolemaida.