TECHNICAL STUDIES FOR THE ADVANCEMENT OF PROJECT MATURITY FOR THE DEVELOPMENT OF NEW CEMETERY INFRASTRUCTURE IN THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE ADVANCEMENT OF PROJECT MATURITY FOR THE DEVELOPMENT OF NEW CEMETERY INFRASTRUCTURE IN THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

Project budget: 12.850.000,00 €
Subject

Technical studies for the new cemeteries of Kozani Municipality.

Description
Preparation of the required implementation studies for the legalisation and construction of the new cemeteries of Kozani city, which are located—according to the current General Urban Plan (GUP) of Kozani Municipality—on the opposite side of the National Connecting Road, along the route from the Tselikas junction to the Kouri forest, with a total area of 76.96 stremmas.
The project specifically includes:
The central church of the cemetery complex, with an estimated area of approximately 300–350 m², depending on the selected architectural style
The church bell tower, with an estimated area of approximately 35 m²
The mortuary building, estimated to be a ground-floor structure of approximately 70–100 m² (instead of 150–200 m² in full development)
A kiosk located opposite the church and other cemetery facilities, at the entrance of the site, with an estimated area of approximately 50 m²
Covered kiosks located in designated areas of each burial zone, with a total estimated area of 850 m² (17 kiosks of 50 m² each), approximately half of which will be constructed in Phase A
A ceremonial hall, ground-floor structure, with a total estimated area of approximately 500 m²
A complex of external W.C. facilities for visitors, with an estimated area of approximately 35 m² (instead of 70 m² in full development)
Result

Creation of new cemeteries in Kozani Municipality.

COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF PONTOKOMI (WASTEWATER, WATER SUPPLY, DISTRICT HEATING, ROAD LIGHTING AND TELECOMMUNICATION NETWORKS) / KOZANI REGIONAL UNIT

COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF PONTOKOMI (WASTEWATER, WATER SUPPLY, DISTRICT HEATING, ROAD LIGHTING AND TELECOMMUNICATION NETWORKS) / KOZANI REGIONAL UNIT

Project budget: 55.750.000,00 €
Subject

Technical studies for the completion of infrastructure works of the new settlement of Pontokomi.

Description
The studies specifically include:
Final design of the internal and external wastewater sewerage networks and preparation of tender documents and Health & Safety Plans (HSP/FSP)
Final design of the internal and external water supply networks and preparation of tender documents and HSP/FSP
Final design of the internal and external district heating network and pumping station
Implementation study for the street lighting and telecommunication networks, and preparation of tender documents and HSP/FSP
Result

Completion of infrastructure in the new settlement of Pontokomi.

TECHNICAL STUDIES FOR THE IMPROVEMENT, UPGRADE AND DEVELOPMENT OF THE INFRASTRUCTURE OF THE UNIVERSITY OF WESTERN MACEDONIA IN FLORINA / FLORINA REGIONAL UNIT

TECHNICAL STUDIES FOR THE IMPROVEMENT, UPGRADE AND DEVELOPMENT OF THE INFRASTRUCTURE OF THE UNIVERSITY OF WESTERN MACEDONIA IN FLORINA / FLORINA REGIONAL UNIT

Project budget: 10.690.000,00 €
Subject

Technical studies for the improvement and upgrading of the infrastructure of the University of Western Macedonia in Florina.

Description
The Region of Western Macedonia, in collaboration with the University of Western Macedonia, has consistently supported the development of the Florina University Campus, particularly in its southern section, where the School of Education and the School of Fine Arts are located.
The studies specifically concern:
Reconstruction of the roof
Landscaping and configuration of the surrounding area
External improvements and renovations
Internal improvements and renovations
Connection to the Florina sewerage network
Regulation of the drainage channel
Result

Improvement of infrastructure at the University of Western Macedonia in Florina.

TECHNICAL STUDY FOR THE EXTENSION OF THE STORMWATER COLLECTION NETWORK PIPELINE TO RELIEVE THE CENTRAL SEWERAGE SYSTEM OF KOZANI / KOZANI REGIONAL UNIT

TECHNICAL STUDY FOR THE EXTENSION OF THE STORMWATER COLLECTION NETWORK PIPELINE TO RELIEVE THE CENTRAL SEWERAGE SYSTEM OF KOZANI / KOZANI REGIONAL UNIT

Project budget: 9.550.000,00 €
Subject

Preparation of supplementary technical studies for the construction of a project to relieve the sewerage system of Kozani city.

Description
As part of the effort to improve and modernise the sewerage system of the city of Kozani, a project is planned to relieve the central sewerage system in the western–southwestern sector.
To this end, a study was prepared for the project entitled:
“Construction of stormwater collection and disposal networks for the relief of the central sewerage system of Kozani.”
During the public consultation phase of the Environmental Impact Assessment (EIA), the issue arose of relocating the stormwater outlet to the same stream as originally proposed, but 1,850 metres downstream from the initial discharge point. This adjustment aims to ensure that the section of the stream running adjacent to the settlement of Karyditsa remains unaffected.
As a result, the following supplementary studies and adaptations are required:
Hydraulic study of the project
Adaptation of the final design
Consolidation of tender documents and Health & Safety Plans (HSP/FSP)
Updated Environmental Impact Assessment
Topographic survey and cadastral mapping
Adaptation of the geological study
Result

Modernisation of the sewerage system in Kozani city.

PROVISION OF SERVICES FOR THE UPDATE OF TECHNICAL STUDIES FOR WATER SUPPLY AND SEWERAGE PROJECTS OF THE MUNICIPALITY OF VOIO / KOZANI REGIONAL UNIT

PROVISION OF SERVICES FOR THE UPDATE OF TECHNICAL STUDIES FOR WATER SUPPLY AND SEWERAGE PROJECTS OF THE MUNICIPALITY OF VOIO / KOZANI REGIONAL UNIT

Project budget: 15.120,00 €
Subject

Update of water supply and sewerage studies for Voio Municipality.

Description
The update concerns the following studies:
Completion of the construction of the internal sewerage network in the settlement of Eratyra, Municipality of Voio
Construction of the Wastewater Treatment Plant (WWTP) and central sewerage pipelines (CSP) for the settlements of Tsotyli and Vronti, Municipality of Voio
Internal stormwater drainage network of the settlement of Eratyra, Municipality of Voio
Result

Improvement of water supply and sewerage conditions in Voio Municipality.

CONNECTION OF THE BUILDING FACILITIES OF THE UNIVERSITY OF WESTERN MACEDONIA IN FLORINA TO THE SEWERAGE NETWORK OF DEYAF / FLORINA REGIONAL UNIT

CONNECTION OF THE BUILDING FACILITIES OF THE UNIVERSITY OF WESTERN MACEDONIA IN FLORINA TO THE SEWERAGE NETWORK OF DEYAF / FLORINA REGIONAL UNIT

Project budget: 150.000,00 €
Subject

Advancement of project maturity for the connection of the building facilities of the University of Western Macedonia in Florina with the city’s sewerage network.

Description
Maturation of the construction of a pressurised pipeline from the transfer/lifting pumping station—currently included in the ongoing contract for the modernisation of the university facilities—up to the Florina sewerage network on Aristofanous Street.
The required studies include:
Final hydraulic study
Environmental study
Topographic survey
Result

Wastewater management for the University of Western Macedonia in Florina.

LEAD-DESIGNER SERVICES PROVISION DURING THE IMPLEMENTATION OF THE PROJECT 'COMPLETION OF INFRASTRUCTURE OF THE NEW SETTLEMENT OF PONTOKOMI (PHASE B ROAD CONSTRUCTION - INFRASTRUCTURE NETWORKS)' / KOZANI REGIONAL UNIT

LEAD-DESIGNER SERVICES PROVISION DURING THE IMPLEMENTATION OF THE PROJECT 'COMPLETION OF INFRASTRUCTURE OF THE NEW SETTLEMENT OF PONTOKOMI (PHASE B ROAD CONSTRUCTION - INFRASTRUCTURE NETWORKS)' / KOZANI REGIONAL UNIT

Project budget: 10.220.651,00 €
Subject

Technical support through the provision of services of a principal designer during the execution phase of the infrastructure completion works of the new settlement of Pontokomi.

Description
The following actions are foreseen:
A) Prior to the commencement of construction works:
Justification and support of the prepared project study
Identification of discrepancies between the contractor’s studies and the authority’s study
Commentary on the contractor’s observations regarding the project studies
B) During the execution of the project:
Commentary on the contractor’s proposals for alternative construction methods
Participation in project coordination meetings
On-site visits and submission of relevant reports
Commentary on proposed modifications to the studies
Result

Completion of infrastructure in the new settlement of Pontokomi.

WATER SUPPLY OF AMYNTAIO AND AETOS FROM SURFACE WATER BODIES / FLORINA REGIONAL UNIT

WATER SUPPLY OF AMYNTAIO AND AETOS FROM SURFACE WATER BODIES / FLORINA REGIONAL UNIT

Project budget: 7.600.000,00 €
Subject

Technical study for the water supply of the settlements of the municipal units of Amyntaio and Aetos.

Description
The water supply for the settlements belonging to the Municipal Units (MUs) of Amyntaio and Aetos, within the Municipality of Amyntaio, will be sourced from the Perikopi stream, with water intake at a suitable location immediately downstream of the existing Small Hydroelectric Plant (SHP) of Asprogeia.
The project will include the following components:
Water intake works on the stream and the conveyance pipeline
Water Treatment Plant (WTP), including structural and electromechanical works
Potable water transmission and distribution network to the reservoirs of the served settlements, with an estimated total length of approximately 31,000 metres
New storage/supply reservoirs and pressure-breaking chambers at appropriate points along the transmission network. The project also includes a telemetry and remote management system controlled from a central monitoring unit
Upon completion, the project will meet the water supply needs of the following settlements:
a. MU of Aetos: Aetos, Agrapidia, Anargyroi, Valtonera, Limnochori, Pedinon. Provision will also be made, if necessary, for the water supply of Asprogeia and Skliros.
b. MU of Amyntaio: Amyntaio (including the settlements of Analipsi – workers’ housing area – and Sotira), Xino Nero, Kelli, Petres, Rodonas, and Fanos.
The settlement of Kleidi is excluded due to its planned relocation as a result of lignite mining operations.
Result

Water supply for the settlements of Amyntaio and Aetos.

TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF ANARGYROI IN THE "KOURI" AREA OF PTOLEMAIDA, NEAR THE NEW KOMANOS (PHASE A) / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF ANARGYROI IN THE "KOURI" AREA OF PTOLEMAIDA, NEAR THE NEW KOMANOS (PHASE A) / KOZANI REGIONAL UNIT

Project budget: 49.300.000,00 €
Subject
Preparation of the required technical studies for the creation of the new settlement of Anargyroi.
Description
    Internal road network of Neoi Anargyroi
Internal and external water supply network of Neoi Anargyroi
Internal and external stormwater drainage network of Neoi Anargyroi
Internal wastewater sewerage network of Neoi Anargyroi
External wastewater sewerage network of Neoi Anargyroi towards Ptolemaida
District heating network of Neoi Anargyroi
Lighting of pedestrian streets in Neoi Anargyroi
Telecommunication and broadband networks in Neoi Anargyroi
Stream landscaping and regulation around the settlement (Phase A – stream regulation and planting)
Stream landscaping and regulation around the settlement (Phase B – landscaping)
Result
Acceleration of the relocation process of Anargyroi settlement through improved project maturity.
COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF ANARGYROI IN THE "KOURI" AREA OF PTOLEMAIDA, NEAR THE NEW KOMANOS / KOZANI REGIONAL UNIT

COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF ANARGYROI IN THE "KOURI" AREA OF PTOLEMAIDA, NEAR THE NEW KOMANOS / KOZANI REGIONAL UNIT

Project budget: 24.980.000,00 €
Subject
Preparation of technical studies as a continuation of those carried out in previous stages of project maturity.
Description
Acceleration of the relocation process of Anargyroi settlement through improved project maturity.
Result
    Demarcation and designation of private plots and preparation of the urban planning implementation study
Final design of the internal road network and preparation of tender documents and Health & Safety Plans (HSP/FSP)
Final design of the external road network
Final design of internal and external stormwater drainage networks and preparation of tender documents and HSP/FSP
Final design of internal and external wastewater sewerage networks and preparation of tender documents and HSP/FSP
Final design of internal and external water supply networks and preparation of tender documents and HSP/FSP
Final design of stream regulation within the settlement and preparation of tender documents and HSP/FSP
TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF MAVROPIGI IN THE "REMINALAR" AREA OF THE MAVROPIGI AGRICULTURAL LAND (PHASE A) / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF MAVROPIGI IN THE "REMINALAR" AREA OF THE MAVROPIGI AGRICULTURAL LAND (PHASE A) / KOZANI REGIONAL UNIT

Project budget: 16.880.000,00 €
Subject
Preparation of the required technical studies for the creation of the new settlement of Mavropigi.
Description
Acceleration of the relocation process of Mavropigi settlement through improved project maturity.
Result
    Internal road network of Nea Mavropigi
Internal and external water supply network of Nea Mavropigi
Stormwater drainage networks of Nea Mavropigi
Internal wastewater sewerage network of Nea Mavropigi
External wastewater sewerage network of Nea Mavropigi
Lighting of the pedestrian street network of Nea Mavropigi
Telecommunication and broadband networks of Nea Mavropigi
COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF MAVROPIGI IN THE "REMINALAR" AREA OF THE MAVROPIGI AGRICULTURAL LAND / KOZANI REGIONAL UNIT

COMPLETION OF TECHNICAL STUDIES FOR THE INFRASTRUCTURE WORKS OF THE NEW SETTLEMENT OF MAVROPIGI IN THE "REMINALAR" AREA OF THE MAVROPIGI AGRICULTURAL LAND / KOZANI REGIONAL UNIT

Project budget: 17.590.000,00 €
Subject
Preparation of technical studies as a continuation of those carried out in previous stages of project maturity.
Description
    Demarcation and designation of private plots and preparation of the urban planning implementation study
Final design of the internal road network and preparation of tender documents and Health & Safety Plans (HSP/FSP)
Final design of the external road network
Final design of internal and external stormwater drainage networks and preparation of tender documents and HSP/FSP
Final design of internal and external wastewater sewerage networks and preparation of tender documents and HSP/FSP
Final design of internal and external water supply networks and preparation of tender documents and HSP/FSP
Final design of stream regulation within the settlement and preparation of tender documents and HSP/FSP
Result
Acceleration of the relocation process of Mavropigi settlement through improved project maturity.
INTERNAL AND EXTERNAL WATER SUPPLY NETWORKS FOR LOCAL COMMUNITIES OF THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

INTERNAL AND EXTERNAL WATER SUPPLY NETWORKS FOR LOCAL COMMUNITIES OF THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

Project budget: 5.235.000,00 €
Subject
Technical studies for water supply projects for the local communities of Kozani Municipality.
Description
    Completion of the replacement of internal water supply networks in the local communities of Krokos and Ano Komi
Redirection of the pressurised pipeline and pumping station of the water supply system in the local community of Krokos
Improvements to the external water supply networks in the local communities of Aiani, Kerassia, Agia Paraskevi, and Rodiani
Improvements to the external water supply networks in the local communities of Milia, Kaisaria, and the pressurised pipeline of Skiti
Result
Improvement of water supply conditions in the local communities of Kozani Municipality.