TECHNICAL STUDIES FOR THE CONSTRUCTION OF RESERVOIRS AND IRRIGATION NETWORK IN THE 'PATATOCHORAFA' AREA OF KASTANIA, MUNICIPALITY OF SERVIA / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE CONSTRUCTION OF RESERVOIRS AND IRRIGATION NETWORK IN THE 'PATATOCHORAFA' AREA OF KASTANIA, MUNICIPALITY OF SERVIA / KOZANI REGIONAL UNIT

Project budget: 2.220.000,00 €
Subject

Advancement of project maturity for the construction of reservoirs and irrigation network in the ‘Patatochorafa’ area of Servia Municipality.

Description
The inability to meet irrigation needs necessitates the construction of reservoirs (limnodexamenes) at selected locations, with a total capacity sufficient to cover agricultural water demands. The project also includes the construction of a water transmission and distribution network from the reservoirs to the agricultural areas, with designated water intake points.
Specifically, the studies concern the maturity of the following works:
Construction of seven reservoirs with a total volume of 250,662 cubic metres, at identified locations
Construction of interconnecting pipelines between the reservoirs (if deemed necessary), transmission pipelines from the reservoirs, and distribution pipelines within the cultivated areas, up to the central water intake points, with a total estimated length of 10,000 metres
Result

Improvement of irrigation conditions in Servia Municipality.

SUPPORTING TECHNICAL STUDIES FOR THE IMPROVEMENT - MODERNISATION OF THE IRRIGATION NETWORK OF LEFKARA COMMUNITY, MUNICIPALITY OF SERVIA / KOZANI REGIONAL UNIT

SUPPORTING TECHNICAL STUDIES FOR THE IMPROVEMENT - MODERNISATION OF THE IRRIGATION NETWORK OF LEFKARA COMMUNITY, MUNICIPALITY OF SERVIA / KOZANI REGIONAL UNIT

Project budget: 1.570.000,00 €
Subject

Technical studies for the upgrading and modernisation of the existing irrigation network of Lefkara in Servia Municipality.

Description
The planned studies concern:
Improvements to the existing equipment, in accordance with the existing study of the Municipality of Servia
Installation and licensing of a photovoltaic (PV) system for electricity generation
Specifically, the studies include:
Update of the project’s tender documents, including the PV system, and preparation of the necessary licensing documentation
Agroeconomic study
Study on potential water savings
Energy efficiency study
Soil study
Financial feasibility study
Project dossier for the small-scale PV system
Result

Upgrading and modernisation of the existing irrigation network in Lefkara, Servia Municipality.

PRELIMINARY TECHNICAL STUDIES FOR THE IRRIGATION SYSTEM OF THE NORTHERN ZONE OF POLYFYTOS LAKE WITH WATER SUPPLY FROM THE POLYFYTOS AND ILARIONAS RESERVOIRS / KOZANI REGIONAL UNIT

PRELIMINARY TECHNICAL STUDIES FOR THE IRRIGATION SYSTEM OF THE NORTHERN ZONE OF POLYFYTOS LAKE WITH WATER SUPPLY FROM THE POLYFYTOS AND ILARIONAS RESERVOIRS / KOZANI REGIONAL UNIT

Project budget: 100.000.000,00 €
Subject

Preliminary technical studies for the irrigation network of the northern zone of Polyfytos.

Description
Irrigation of the area is planned through the pumping of the required water quantities from the Polyfytos and Ilarion reservoirs.
The total gross area of the region is estimated at 46,550 stremmas, covering the land areas of the following communities: Amygdalia, Ano Komi, Vathylakkos, Kaisareia, Kato Komi, Kontovouni, Mesiani, Petrana, Roditis, and Spartos.
The project is divided into two zones:
Low zone: 7,630 stremmas
High zone: 16,550 stremmas
The main components of the project to be constructed for the utilisation of the area include irrigation and drainage infrastructure, as well as roadworks.
The studies to be carried out for both sections (from the Polyfytos and Ilarion reservoirs) include:
Preliminary hydraulic studies of the supply pipelines
Preliminary hydraulic studies of the distribution network
Preliminary hydraulic studies of the reservoirs
Preliminary hydraulic studies of the pumping stations
Preliminary hydraulic studies of the electromechanical installations
Result

Expansion of irrigated land in Servia Municipality.

PRELIMINARY TECHNICAL STUDIES OF THE IRRIGATION SYSTEM OF THE NORTHERN ZONE OF POLYFYTOS LAKE WITH WATER SUPPLY FROM THE POLYFYTOS AND ILARION RESERVOIRS / KOZANI REGIONAL UNIT

PRELIMINARY TECHNICAL STUDIES OF THE IRRIGATION SYSTEM OF THE NORTHERN ZONE OF POLYFYTOS LAKE WITH WATER SUPPLY FROM THE POLYFYTOS AND ILARION RESERVOIRS / KOZANI REGIONAL UNIT

Project budget: 100.000.000,00 €
Subject

Pre-design technical studies for the irrigation network of the northern zone of Polyfytos.

Description
This phase constitutes a continuation of the preliminary studies previously conducted for the irrigation network of the Northern Zone of Polyfytos.
Specifically, the studies to be carried out in this phase, covering both sections (from the Polyfytos Reservoir via pumping and from the Ilarion Reservoir), include:
Pre-design hydraulic studies of the supply pipelines
Pre-design hydraulic studies of the distribution network
Pre-design hydraulic studies of the reservoirs
Pre-design hydraulic studies of the pumping stations
Pre-design hydraulic studies of the electromechanical installations
Environmental studies
Result

Expansion of irrigated land in Servia Municipality.

TECHNICAL STUDIES FOR THE PREPARATION OF THE CADASTRE - PHASE A OF THE IRRIGATION NETWORKS OF THE FLORINA PLAIN / FLORINA REGIONAL UNIT

TECHNICAL STUDIES FOR THE PREPARATION OF THE CADASTRE - PHASE A OF THE IRRIGATION NETWORKS OF THE FLORINA PLAIN / FLORINA REGIONAL UNIT

Project budget: 259.304,00 €
Subject

Preparation of topographic and cadastral technical studies.

Description
Topographic and cadastral works are being carried out for the preparation of the Cadastral File for Phase A of the irrigation networks of the Florina Plain, based on the utilisation of the Triantafyllia Dam.
This irrigation network includes water conveyance and distribution infrastructure from the Triantafyllia Dam, as well as sewerage, drainage, flood protection works, and associated roadworks, covering a total area of 54,000 stremmas.
The studies carried out include:
Topographic and cadastral survey of the zone surrounding the axis of the conveyance pipelines
Preparation of the cadastral file for the area surrounding the axis of the conveyance pipelines
Cadastral survey of the zone surrounding the axis of the irrigation pipelines and drainage canals within the land consolidation areas, as well as the zone of the main supply pipeline, for the preparation of the cadastral file
Result

Improvement of irrigation conditions, expansion of irrigated land, support for land consolidation and crop restructuring.

TECHNICAL STUDIES FOR THE MODERNISATION OF THE IRRIGATION NETWORKS OF ANO KOMI - KATO KOMI OF THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

TECHNICAL STUDIES FOR THE MODERNISATION OF THE IRRIGATION NETWORKS OF ANO KOMI - KATO KOMI OF THE MUNICIPALITY OF KOZANI / KOZANI REGIONAL UNIT

Project budget: 2.900.000,00 €
Subject

Technical studies for the modernisation of the irrigation networks of Ano Komi and Kato Komi.

Description
The project concerns the modernisation of the existing outdated irrigation infrastructure and the expansion of the irrigation network in Ano Komi, while simultaneously ensuring the availability of the necessary irrigation water.
Specifically, the project will include the following components:
Modernisation of the irrigation networks of Ano Komi and Kato Komi as Phase A, covering approximately 900 stremmas in Ano Komi and 180 stremmas in Kato Komi.
Expansion of the irrigation network in Ano Komi as Phase B, initially covering an area of approximately 1,400 stremmas.
Upgrading of equipment in the existing boreholes that contribute to the irrigation network in a supplementary capacity.
Integration of a photovoltaic (PV) system for energy offsetting (net metering) to cover the energy consumption of the irrigation system.
Securing irrigation water through the construction of reservoir(s) for the seasonal collection and storage of water from the Vranas stream.
Legalisation and permitting of all existing and proposed works within the irrigation network.
Required Studies for Project Maturation
A) For the Modernisation Phase:
Irrigation network studies for Ano Komi and Kato Komi.
Study for the improvement of water intake and boreholes.
Preliminary studies for the reservoir and its connection pipeline to the irrigation network.
Preparation of tender documents and Health & Safety Plans (HSP/FSP).
Environmental Impact Assessment (EIA).
Hydrological study.
Geological study.
Techno-economic feasibility study.
Water use permit application dossier.
B) For the Expansion Phase:
Preliminary studies for the irrigation network, reservoir, and pumping station.
Environmental Impact Assessment (EIA).
Geological study.
Topographic surveys.
Techno-economic feasibility study.
Water use permit application dossier.
Result

Environmental protection, reduced production costs, and increased added value of agricultural land.

TECHNICAL STUDIES FOR THE PROTECTION AND REHABILITATION OF LAKE KASTORIA (STUDIES, TENDER DOCUMENTS AND PREPARATION OF BUILDING PERMIT FILES) / KASTORIA REGIONAL UNIT

TECHNICAL STUDIES FOR THE PROTECTION AND REHABILITATION OF LAKE KASTORIA (STUDIES, TENDER DOCUMENTS AND PREPARATION OF BUILDING PERMIT FILES) / KASTORIA REGIONAL UNIT

Project budget: 67.894,00 €
Subject

Preparation of supporting technical studies, licensing files and tender documents per LID and agricultural holding for the protection of Kastoria Lake.

Description
Result

Protection and restoration of Kastoria Lake.